Skip to content

Bridge replacement to close Second Line

Bridge replacement will begin Monday, Sept.16
town-of-erin-bridge-0910

NEWS RELEASE
TOWN OF ERIN
*************************
The Town of Erin advises residents that Bridge 5 replacement work will close Second Line approximately 1.7 km west of Sideroad 27 for bridge replacement beginning Monday, Sept.16, 2024.

Bridge 5 must be replaced due to public safety concerns. At present, the bridge replacement is expected to be completed by Oct.15, 2024, however there is a possibility the construction may take longer based on weather. Local access will be maintained at all times for residents and businesses, from either the west or the east, however, through-access will not be permitted during construction.

All agencies, such as, but not limited to: emergency services, student transportation services, waste collection and postal service will all be notified of the road closure. Road closure notification signs will be installed and maintained throughout the project.

Your patience during the work is appreciated.

*************************